Opens in a new tab
You Name It, We Pave ItGet your FREE estimate today!
(432) 878-8059
New asphalt driveway paved by West Tex Paving in West Texas

Driveway Paving in Midland & Odessa

New asphalt driveways, overlays, and full replacements. Built on a compacted caliche base and priced with a free on-site estimate.

Driveway Paving by city: Driveway Paving in Midland and Driveway Paving in Odessa.

A good driveway out here comes down to what's under it. We grade the ground, compact a real caliche base, and lay hot mix thick enough for what actually parks on it, so the surface stays smooth instead of cracking apart by its second summer.

West Tex Paving has paved driveways across Midland, Odessa, and the Permian Basin since 1975. You get a free estimate, a firm price, and a crew that shows up when it said it would.

Long new asphalt driveway paved by West Tex Paving across a ranch property
A new asphalt driveway we paved in the Permian Basin.
See more driveway projects →
What we do

Our Driveway Paving Services

New driveway installation

Grade, base, and hot mix for new builds, or to finally replace a gravel drive that ruts and dusts.

Driveway resurfacing & overlays

A fresh asphalt layer over a driveway that's rough on top but solid underneath. New surface, fraction of the cost. More on driveway resurfacing →

Removal & replacement

When the base has failed, we tear out and rebuild from the dirt up so the new asphalt holds.

Repairs & widening

Crack filling, patching, parking pads, and extensions tied cleanly into the existing drive.

Straight pricing

What a New Driveway Costs

There's no flat rate: four things set the number. We measure on site and give you a free estimate. For the long version, read our asphalt driveway cost guide.

Size

Square footage is the biggest driver. A long ranch approach is a different job than a two-car drive.

Ground prep

Solid, firm ground needs less base work. Soft ground needs more, and skipping it is how driveways fail.

New vs. overlay

An overlay over a sound base costs well under a full tear-out. We'll tell you which one your driveway needs.

Access

Open sites pave fast. Tight spots, gates, and slopes take more handwork.

On a tight budget? Ask about recycled millings or chip seal. On long drives they can save you thousands.

How it works

How Your Driveway Goes In

  1. 1

    We come look

    We measure the drive, check the ground, and talk through your options.

  2. 2

    You get a firm price

    A free estimate with the scope spelled out. Take the time you need to decide.

  3. 3

    Prep day

    Tear-out if needed, then grading and a compacted caliche base: the part that makes it last.

  4. 4

    Paving day

    Hot mix laid and rolled tight. Most driveways are done in a day or two, then stay off it while it cures.

Why West Tex Paving

Driveways Built to Last in the Permian Basin

  • Compacted caliche base under every drive
  • Built for triple-digit summers & heavy pickups
  • Free on-site estimates
  • Local crews: paving here since 1975
Free estimate

Get a Price on Your Driveway

We pave driveways every week across Odessa, Midland, and the surrounding towns, alongside sealcoating, asphalt repair, and parking lot paving. One local contractor for every paved surface on the property.

  • Free on-site estimate. We measure, you decide
  • Firm price before work starts
  • Phone answered 8am–8pm, every day

Or just call us: (432) 878-8059.

Request your free estimate

Send your name and number and we'll call you back to set a time.

    No obligation. We'll never share your details. By submitting, you agree to be contacted about your project at the number provided.

    Good to know

    Driveway Paving FAQs

    How long does an asphalt driveway last in West Texas?

    A properly installed asphalt driveway typically lasts 15-20 years out here. Sealcoating every 2-3 years protects it from the intense Permian Basin sun and UV, which is the biggest factor in how fast the surface ages. Keeping cracks filled before water reaches the base is the other thing that decides whether you reach the high end of that range.

    How much does a new asphalt driveway cost?

    It depends on size, base condition, access, and whether it's a new install or a resurface over a sound base. A resurface costs well under a full rebuild, and replacing a worn gravel drive with asphalt falls in between. We provide a free estimate after measuring your property and checking the sub-grade, so the number is accurate, not a guess.

    Can you resurface my driveway instead of replacing it?

    Often, yes. If the base is still sound and the damage is surface-level, an overlay costs less than a full replacement. We assess the sub-grade first and recommend only what your driveway actually needs. A resurface where it'll hold, a full rebuild only when the base has truly failed.

    How thick should an asphalt driveway be?

    For a typical residential driveway in the Permian Basin we build on a compacted caliche or aggregate base and lay 2-3 inches of hot-mix asphalt. Driveways that carry heavier vehicles, RVs, or trailers get a deeper base and a thicker surface, so the pavement doesn't rut or crack early under the load.

    How soon can I drive on a new asphalt driveway?

    Usually you can walk on it within hours and drive on it after 24-48 hours. In the West Texas heat fresh asphalt stays soft a bit longer, so we'll give you a specific time on install day and ask you to keep sharp turns and parked weight off it for the first few days.

    Our work

    Recent driveway paving projects

    New asphalt circle drive with a concrete apron, August 2024
    New asphalt circle drive with a concrete apron, August 2024
    New asphalt driveway up to a home on open acreage
    New asphalt driveway up to a home on open acreage
    New asphalt circle drive in front of a metal shop building
    New asphalt circle drive in front of a metal shop building
    Completed new residential asphalt driveway
    Completed new residential asphalt driveway
    Finished residential driveway paved to the street
    Finished residential driveway paved to the street
    New asphalt driveway construction in the Permian Basin
    New asphalt driveway construction in the Permian Basin

    View the full gallery →

    Ready for a Smooth New Driveway?

    Most driveways are paved in a day or two. Free estimates across Midland, Odessa & the Permian Basin.